Bright Renewables - Compressed Natural Gas Project - Virtual Pipeline - Michigan USA

Bio-CNG plant in Michigan, USA

This bio-CNG project, located in Michigan USA, consists of a biogas upgrading system including CNG technology. Through a virtual pipeline, the produced bio-CNG is distributed.
Bright Renewables - Biogas Upgrading - Bio-CNG - Project Michigan USA

Bio-CNG with virtual pipeline

The client uses virtual pipeline technology in addition to bioCNG technology, which allows for easy transportation to a gas injection point (CNG fueling station). The CNG technology is incorporated in the biogas upgrading system, in order to optimize space utilization. Bio-CNG is generated with a compressor, which increases the pressure of the biomethane to 3600 psi. After compression, the bioCNG is stored in tube trailers. These trailers are filled with the use of dispensers.

Bio-CNG transportation

Bio-CNG produced
0 million SCFM / year
Efficiency
0 %

The bio-CNG project, located in Michigan USA, consists of a biogas upgrading system including CNG technology. The produced bio-CNG is transported to a grid point through a virtual pipeline.

Bright Renewables - Biogas Upgrading - Bio-CNG - Project Michigan USA
Bio-CNG produced
0 million SCFM / year
Efficiency
0 %

Technical aspects

Type
Biogas capacity
Bio-CNG capacity
Methane concentration biogas
Methane concentration biomethane
Efficiency
Specifications
PurePac-CNG Compact
350 SCFM (567 Nm3/hr) biogas
205 SCFM (460 Nm3/hr) bio-CNG
57%
97%
99.5%

Project highlights

  • Incorporated heat recovery system
  • Virtual pipeline and easy transportation
  • Containerized and compact design
Bright Renewables - Biogas Upgrading - Bio-CNG - Project Michigan USA